We are a global operator of essential infrastructure

Driving change since 1985

In 1985 we became the world's first Transmission System Operator (TSO). Since then, we have grown with a firm commitment to serving society, promoting technological excellence and we have consolidated a culture based on diversity and equal opportunities. Today we are a robust and diversified group with a sole purpose: to guarantee the electricity supply and ensure connectivity, while driving a green transition that is fair and based on sustainability criteria, showcasing our neutrality and contributing to social and territorial cohesion. Today, we still continue to drive change.

1985

Creation of Red Eléctrica as the first TSO in the world.
Electricity control centre (Cecoel)

1997

Development of the first electricity interconnection with Morocco.
Cargo ship releasing submarine power cable

1997

The Company begins its own fibre optic development within the national electricity grid in Spain.
Fiber optic cable

1999

The Company was privatised and was listed on the Spanish Stock Exchange through an IPO.
Madrid Stock Exchange

2001

Creation of Red Eléctrica Internacional for investments in projects abroad.
Train station platform

2004

Red Eléctrica listed in the IBEX 35.
Red Eléctrica listed in the IBEX 35

2006

Creation of the Control Centre of Renewable Energies (CECRE).
Creation of the Control Centre of Renewable Energies (CECRE).

2008

Creation of Inelfe, jointly owned in equal shares with RTE, to carry out interconnection projects between Spain and France.
Inelfe subway tunnel

2015

Reintel created to boost the telecommunications business: operation of the fiber optic networks of Red Eléctrica and ADIF.
fiber optic cable

2015

Commissioning of the Spain-France cross-border connection.
Commissioning of the Spain-France cross-border connection.

2016

Electricity transmission grid management activities commenced in Chile.
power station

2019

Creation of Elewit, Redeia’s technological platform.
Silvia Bruno presenting Elewit

2019

Acquisition of Hispasat.
Hispasat satellite with the Earth in the background

2020

Beginning of our electricity transmission activity in Brazil.
power line

2022

Work begins on the Salto de Chira, the first major energy storage system in the Canary Islands.
Salto de Chira pumped-storage hydropower plant

2023

Submarine laying of the new electricity link between Eivissa and Formentera.
Submarine laying of the new electricity link between Eivissa and Formentera.

Our organisation

Carlos Méndez-Trelles
General Counsel and Non-Director Secretary of the Board of Directors
Miryam Aguilar
Corporate Director of External Relations, Communication and Territory
Eva Pagán
Corporate Director of Sustainability and Research
Eva Rodicio
Manager of Internal Audit and Risk Control Management
Roberto García
Chief Executive Officer
Concepción Sánchez
Concepción Sánchez
General Director of System Operation
Ángel Luis Mahou Fernández
Ángel Mahou
General Director of Transmission
Juan Majada Tortosa
Juan Majada Tortosa
General Director of International Business
Mariano Aparicio
Mariano Aparicio
General Director of Telecommunications
Emilio Cerezo
Chief Financial Officer
José Antonio Vernia
Corporate Director of Transformation and Resources
Silvia Bruno
Chief Innovation & Technology Officer
Carlos Puente
Corporate Development Director
blank
Regulation and Legal Services Director

A network of diverse talent

A team of professional experts
blank
2,400
Women on the Board of Directors
blank
50%
Women on the management team
blank
35.3%
Prepared. Committed. Diverse

Redeia is comprised of a network of more than 2,400 experts; more than 2,400 talented professionals who work every day to generate value for society and improve people's lives, with the utmost respect for the ethical values of the Company: respect, integrity, sustainability. At Redeia, we embrace talent and diversity, and we are fully committed to an inclusive culture.

Change does not happen alone. Would you like to be a part of it?